Does solar pay in Odessa, TX?

A typical Odessa home on your retail electricity provider uses about 1,096 kWh a month. Covering that takes about 7.4 kW of panels. Bought at $3.00 a watt ($22,200) with no federal tax credit, it pays for itself in 10.3 yrs if exports earn full retail credit, or 15.9 yrs if they earn much less.

1,781kWh per kW of panels a year (south, 20°)
14.9¢avg. price per kWh, Texas average (2024)
$1,966first-year bill savings, 7.4 kW, full net metering
$39,284net gain over 25 years after paying $22,200

Payback by installed price and export credit

Two things you control or should ask about move the answer most: the price per watt you are quoted, and how your utility credits the power your panels send to the grid when you are not using it.

Installed priceSystem cost (7.4 kW)Payback, full net meteringPayback, reduced export credit25-year net, full / reduced
$2.50/W$18,5008.7 yrs13.7 yrs$42,984 / $20,949
$3.00/W$22,20010.3 yrs15.9 yrs$39,284 / $17,249
$3.50/W$25,90012.4 yrs18.0 yrs$35,584 / $13,549

Full net metering: every kWh the panels make up to the home's yearly use is worth the retail rate. Reduced export credit: half the output is used as it is made, the other half earns 30% of retail (roughly how California's 2023 tariff and similar "net billing" rules work). Both cases: 0.5%/yr panel degradation, 2.5%/yr price rises, one inverter replacement in year 12. Details.

How much sun Odessa gets

917 Jan 963 Feb 1188 Mar 1272 Apr 1251 May 1241 Jun 1194 Jul 1214 Aug 1020 Sep 1084 Oct 962 Nov 869 Dec
Modelled output of a 7.4 kW south-facing system in Odessa, TX (kWh per month)
Roof faceskWh per kW a yearvs south7.4 kW system, kWh a year
South1,781—13,179
West1,549-13%11,463
East1,531-14%11,329

Sunlight on a 20° panel here averages 2,302 kWh per square metre a year. December output is 68% of the best month, which matters if your utility settles credits monthly rather than yearly.

Your utility and your bill

Odessa is in a retail-choice area: you pick an electricity plan from competing retailers, and the poles and wires belong to the local delivery company. Export credit for solar depends on the plan you choose, so ask any retailer about its solar buyback terms. This page uses the Texas 2024 residential average of 14.9¢ per kWh and 1,096 kWh a month.

Other utilities also serve parts of Ector County. If your bill comes from one of these, use its numbers in the calculator below:

UtilityAvg. price/kWh (2024)Avg. use/monthNet-metered solar homes
Southwestern Public Service Co13.4¢957 kWh0

Run your own numbers

Nearby cities

CitykWh/kW a yearPrice/kWhPayback at $3/W, full / reduced
Midland, TX1,77614.9¢10.3 yrs / 16.0 yrs
Lubbock, TX1,76113.7¢11.7 yrs / 17.3 yrs
Abilene, TX1,65814.9¢11.0 yrs / 16.9 yrs
Amarillo, TX1,73813.4¢12.3 yrs / 17.9 yrs
El Paso, TX1,86813.5¢10.8 yrs / 16.7 yrs

All 41 cities we cover in Texas: solar payback in Texas. Not your city? Look up your ZIP code.

Questions

How long does solar take to pay off in Odessa?

About 8.7 yrs to 18.0 yrs for a 7.4 kW system bought for cash, depending on the installed price ($2.50–$3.50 per watt) and on how your retail electricity provider credits power you send to the grid. At $3.00 per watt it is 10.3 yrs with full net metering.

Is there still a 30% federal solar tax credit in 2026?

No, not for systems you buy. The Residential Clean Energy Credit (Section 25D) ended for expenditures after December 31, 2025. Leased systems and power-purchase agreements are owned by a company that may still claim a business credit and pass some of it on in the price; the payback figures here assume you buy the system with cash and claim no credit.

How much electricity does a solar panel system produce in Odessa?

Each kW of south-facing panels at a 20° tilt produces about 1,781 kWh a year here (PVGIS model, NSRDB weather data). East-facing panels produce 14% less, west-facing 13% less.

What does electricity cost in Odessa?

Odessa is in a retail-choice area, so the price depends on the plan you pick. The Texas residential average in 2024 was 14.9¢ per kWh (EIA-861); this page uses that.