Does solar pay in Laredo, TX?

A typical Laredo home on Medina Electric Coop, Inc uses about 1,128 kWh a month. Covering that takes about 8.4 kW of panels. Bought at $3.00 a watt ($25,200) with no federal tax credit, it pays for itself in 14.4 yrs if exports earn full retail credit, or 20.7 yrs if they earn much less.

1,604kWh per kW of panels a year (south, 20°)
12.1¢avg. price per kWh, Medina Electric Coop, Inc (2024)
$1,630first-year bill savings, 8.4 kW, full net metering
$25,256net gain over 25 years after paying $25,200

Payback by installed price and export credit

Two things you control or should ask about move the answer most: the price per watt you are quoted, and how your utility credits the power your panels send to the grid when you are not using it.

Installed priceSystem cost (8.4 kW)Payback, full net meteringPayback, reduced export credit25-year net, full / reduced
$2.50/W$21,00012.4 yrs18.0 yrs$29,456 / $11,208
$3.00/W$25,20014.4 yrs20.7 yrs$25,256 / $7,008
$3.50/W$29,40016.3 yrs23.3 yrs$21,056 / $2,808

Full net metering: every kWh the panels make up to the home's yearly use is worth the retail rate. Reduced export credit: half the output is used as it is made, the other half earns 30% of retail (roughly how California's 2023 tariff and similar "net billing" rules work). Both cases: 0.5%/yr panel degradation, 2.5%/yr price rises, one inverter replacement in year 12. Details.

How much sun Laredo gets

916 Jan 922 Feb 1185 Mar 1204 Apr 1252 May 1275 Jun 1283 Jul 1325 Aug 1105 Sep 1168 Oct 978 Nov 861 Dec
Modelled output of a 8.4 kW south-facing system in Laredo, TX (kWh per month)
Roof faceskWh per kW a yearvs south8.4 kW system, kWh a year
South1,604—13,474
West1,450-10%12,180
East1,424-11%11,962

Sunlight on a 20° panel here averages 2,126 kWh per square metre a year. December output is 65% of the best month, which matters if your utility settles credits monthly rather than yearly.

Your utility and your bill

Other utilities also serve parts of Webb County. If your bill comes from one of these, use its numbers in the calculator below:

UtilityAvg. price/kWh (2024)Avg. use/monthNet-metered solar homes
Rio Grande Electric Coop, Inc18.5¢930 kWh0

Run your own numbers

Nearby cities

CitykWh/kW a yearPrice/kWhPayback at $3/W, full / reduced
Edinburg, TX1,55910.2¢17.1 yrs / 24.4 yrs
McAllen, TX1,56514.9¢12.2 yrs / 17.8 yrs
Corpus Christi, TX1,54814.9¢12.3 yrs / 17.9 yrs
San Antonio, TX1,52412.4¢14.7 yrs / 21.2 yrs
Brownsville, TX1,51310.2¢17.5 yrs / 25.0 yrs

All 41 cities we cover in Texas: solar payback in Texas. Not your city? Look up your ZIP code.

Questions

How long does solar take to pay off in Laredo?

About 12.4 yrs to 23.3 yrs for a 8.4 kW system bought for cash, depending on the installed price ($2.50–$3.50 per watt) and on how Medina Electric Coop, Inc credits power you send to the grid. At $3.00 per watt it is 14.4 yrs with full net metering.

Is there still a 30% federal solar tax credit in 2026?

No, not for systems you buy. The Residential Clean Energy Credit (Section 25D) ended for expenditures after December 31, 2025. Leased systems and power-purchase agreements are owned by a company that may still claim a business credit and pass some of it on in the price; the payback figures here assume you buy the system with cash and claim no credit.

How much electricity does a solar panel system produce in Laredo?

Each kW of south-facing panels at a 20° tilt produces about 1,604 kWh a year here (PVGIS model, NSRDB weather data). East-facing panels produce 11% less, west-facing 10% less.

What does electricity cost in Laredo?

Medina Electric Coop, Inc residential customers paid 12.1¢ per kWh on average in 2024, fixed charges included (EIA-861). The Texas average was 14.9¢.