Does solar pay in Garden Grove, CA?

A typical Garden Grove home on Southern California Edison Co uses about 506 kWh a month. Covering that takes about 3.6 kW of panels. Bought at $3.00 a watt ($10,800) with no federal tax credit, it pays for itself in about 7.8 yrs under California's reduced export credit (5.2 yrs if every kWh were credited at retail, which new customers no longer get).

California moved new solar customers of its big utilities to net billing in April 2023 (the "NEM 3.0" tariff): exports earn far less than retail. Check your utility's current solar tariff before you sign.

1,706kWh per kW of panels a year (south, 20°)
32.4¢avg. price per kWh, Southern California Edison Co (2024)
$1,295first-year bill savings, 3.6 kW, reduced export credit
$29,881net gain over 25 years after paying $10,800

Payback by installed price and export credit

Two things you control or should ask about move the answer most: the price per watt you are quoted, and how your utility credits the power your panels send to the grid when you are not using it.

Installed priceSystem cost (3.6 kW)Payback, full net meteringPayback, reduced export credit25-year net, full / reduced
$2.50/W$9,0004.4 yrs6.6 yrs$53,947 / $31,681
$3.00/W$10,8005.2 yrs7.8 yrs$52,147 / $29,881
$3.50/W$12,6006.0 yrs9.0 yrs$50,347 / $28,081

Full net metering: every kWh the panels make up to the home's yearly use is worth the retail rate. Reduced export credit: half the output is used as it is made, the other half earns 30% of retail (roughly how California's 2023 tariff and similar "net billing" rules work). Both cases: 0.5%/yr panel degradation, 2.5%/yr price rises, one inverter replacement in year 12. Details.

How much sun Garden Grove gets

392 Jan 414 Feb 542 Mar 586 Apr 604 May 581 Jun 606 Jul 618 Aug 535 Sep 488 Oct 413 Nov 364 Dec
Modelled output of a 3.6 kW south-facing system in Garden Grove, CA (kWh per month)
Roof faceskWh per kW a yearvs south3.6 kW system, kWh a year
South1,706—6,142
West1,530-10%5,508
East1,415-17%5,094

Sunlight on a 20° panel here averages 2,204 kWh per square metre a year. December output is 59% of the best month, which matters if your utility settles credits monthly rather than yearly.

Your utility and your bill

Other utilities also serve parts of Orange County. If your bill comes from one of these, use its numbers in the calculator below:

UtilityAvg. price/kWh (2024)Avg. use/monthNet-metered solar homes
San Diego Gas & Electric Co43.6¢365 kWh325,401
City of Anaheim - (CA)17.1¢467 kWh5,154

Run your own numbers

Nearby cities

CitykWh/kW a yearPrice/kWhPayback at $3/W, full / reduced
Santa Ana, CA1,70132.4¢5.2 yrs / 7.8 yrs
Orange, CA1,69932.4¢5.2 yrs / 7.8 yrs
Huntington Beach, CA1,67532.4¢5.3 yrs / 7.9 yrs
Fullerton, CA1,68432.4¢5.3 yrs / 7.9 yrs
Costa Mesa, CA1,67532.4¢5.3 yrs / 7.9 yrs

All 63 cities we cover in California: solar payback in California. Not your city? Look up your ZIP code.

Questions

How long does solar take to pay off in Garden Grove?

About 4.4 yrs to 9.0 yrs for a 3.6 kW system bought for cash, depending on the installed price ($2.50–$3.50 per watt) and on how Southern California Edison Co credits power you send to the grid. At $3.00 per watt it is 7.8 yrs under the reduced export credit new customers here get.

Is there still a 30% federal solar tax credit in 2026?

No, not for systems you buy. The Residential Clean Energy Credit (Section 25D) ended for expenditures after December 31, 2025. Leased systems and power-purchase agreements are owned by a company that may still claim a business credit and pass some of it on in the price; the payback figures here assume you buy the system with cash and claim no credit.

How much electricity does a solar panel system produce in Garden Grove?

Each kW of south-facing panels at a 20° tilt produces about 1,706 kWh a year here (PVGIS model, NSRDB weather data). East-facing panels produce 17% less, west-facing 10% less.

What does electricity cost in Garden Grove?

Southern California Edison Co residential customers paid 32.4¢ per kWh on average in 2024, fixed charges included (EIA-861). The California average was 32.0¢.