Does solar pay in Arvada, CO?

A typical Arvada home on Public Service Co of Colorado uses about 600 kWh a month. Covering that takes about 4.8 kW of panels. Bought at $3.00 a watt ($14,400) with no federal tax credit, it pays for itself in 12.7 yrs if exports earn full retail credit, or 18.4 yrs if they earn much less.

1,490kWh per kW of panels a year (south, 20°)
15.0¢avg. price per kWh, Public Service Co of Colorado (2024)
$1,076first-year bill savings, 4.8 kW, full net metering
$19,062net gain over 25 years after paying $14,400

Payback by installed price and export credit

Two things you control or should ask about move the answer most: the price per watt you are quoted, and how your utility credits the power your panels send to the grid when you are not using it.

Installed priceSystem cost (4.8 kW)Payback, full net meteringPayback, reduced export credit25-year net, full / reduced
$2.50/W$12,00010.2 yrs15.9 yrs$21,462 / $9,414
$3.00/W$14,40012.7 yrs18.4 yrs$19,062 / $7,014
$3.50/W$16,80014.4 yrs20.8 yrs$16,662 / $4,614

Full net metering: every kWh the panels make up to the home's yearly use is worth the retail rate. Reduced export credit: half the output is used as it is made, the other half earns 30% of retail (roughly how California's 2023 tariff and similar "net billing" rules work). Both cases: 0.5%/yr panel degradation, 2.5%/yr price rises, one inverter replacement in year 12. Details.

How much sun Arvada gets

444 Jan 477 Feb 658 Mar 679 Apr 709 May 749 Jun 709 Jul 669 Aug 621 Sep 558 Oct 474 Nov 406 Dec
Modelled output of a 4.8 kW south-facing system in Arvada, CO (kWh per month)
Roof faceskWh per kW a yearvs south4.8 kW system, kWh a year
South1,490—7,152
West1,206-19%5,789
East1,307-12%6,274

Sunlight on a 20° panel here averages 1,894 kWh per square metre a year. December output is 54% of the best month, which matters if your utility settles credits monthly rather than yearly.

Your utility and your bill

Other utilities also serve parts of Jefferson County. If your bill comes from one of these, use its numbers in the calculator below:

UtilityAvg. price/kWh (2024)Avg. use/monthNet-metered solar homes
CORE Electric Cooperative15.0¢864 kWh10,006
United Power, Inc15.8¢811 kWh12,610

Run your own numbers

Nearby cities

CitykWh/kW a yearPrice/kWhPayback at $3/W, full / reduced
Westminster, CO1,51515.0¢12.5 yrs / 18.1 yrs
Lakewood, CO1,51915.0¢12.5 yrs / 18.1 yrs
Thornton, CO1,57515.0¢12.1 yrs / 17.6 yrs
Denver, CO1,58515.0¢12.0 yrs / 17.5 yrs
Centennial, CO1,59215.0¢11.9 yrs / 17.4 yrs

All 11 cities we cover in Colorado: solar payback in Colorado. Not your city? Look up your ZIP code.

Questions

How long does solar take to pay off in Arvada?

About 10.2 yrs to 20.8 yrs for a 4.8 kW system bought for cash, depending on the installed price ($2.50–$3.50 per watt) and on how Public Service Co of Colorado credits power you send to the grid. At $3.00 per watt it is 12.7 yrs with full net metering.

Is there still a 30% federal solar tax credit in 2026?

No, not for systems you buy. The Residential Clean Energy Credit (Section 25D) ended for expenditures after December 31, 2025. Leased systems and power-purchase agreements are owned by a company that may still claim a business credit and pass some of it on in the price; the payback figures here assume you buy the system with cash and claim no credit.

How much electricity does a solar panel system produce in Arvada?

Each kW of south-facing panels at a 20° tilt produces about 1,490 kWh a year here (PVGIS model, NSRDB weather data). East-facing panels produce 12% less, west-facing 19% less.

What does electricity cost in Arvada?

Public Service Co of Colorado residential customers paid 15.0¢ per kWh on average in 2024, fixed charges included (EIA-861). The Colorado average was 14.9¢.