Does solar pay in Hillsboro, OR?

A typical Hillsboro home on Portland General Electric Co uses about 777 kWh a month. Covering that takes about 8.2 kW of panels. Bought at $3.00 a watt ($24,600) with no federal tax credit, it pays for itself in 13.6 yrs if exports earn full retail credit, or 19.6 yrs if they earn much less.

1,140kWh per kW of panels a year (south, 20°)
18.2¢avg. price per kWh, Portland General Electric Co (2024)
$1,697first-year bill savings, 8.2 kW, full net metering
$28,134net gain over 25 years after paying $24,600

Payback by installed price and export credit

Two things you control or should ask about move the answer most: the price per watt you are quoted, and how your utility credits the power your panels send to the grid when you are not using it.

Installed priceSystem cost (8.2 kW)Payback, full net meteringPayback, reduced export credit25-year net, full / reduced
$2.50/W$20,50010.9 yrs17.0 yrs$32,234 / $13,205
$3.00/W$24,60013.6 yrs19.6 yrs$28,134 / $9,105
$3.50/W$28,70015.4 yrs22.1 yrs$24,034 / $5,005

Full net metering: every kWh the panels make up to the home's yearly use is worth the retail rate. Reduced export credit: half the output is used as it is made, the other half earns 30% of retail (roughly how California's 2023 tariff and similar "net billing" rules work). Both cases: 0.5%/yr panel degradation, 2.5%/yr price rises, one inverter replacement in year 12. Details.

How much sun Hillsboro gets

340 Jan 482 Feb 693 Mar 918 Apr 1092 May 1094 Jun 1324 Jul 1203 Aug 937 Sep 618 Oct 359 Nov 290 Dec
Modelled output of a 8.2 kW south-facing system in Hillsboro, OR (kWh per month)
Roof faceskWh per kW a yearvs south8.2 kW system, kWh a year
South1,140—9,348
West997-13%8,175
East975-14%7,995

Sunlight on a 20° panel here averages 1,478 kWh per square metre a year. December output is 22% of the best month, which matters if your utility settles credits monthly rather than yearly.

Your utility and your bill

Other utilities also serve parts of Washington County. If your bill comes from one of these, use its numbers in the calculator below:

UtilityAvg. price/kWh (2024)Avg. use/monthNet-metered solar homes
City of Forest Grove9.9¢977 kWh83

Run your own numbers

Nearby cities

CitykWh/kW a yearPrice/kWhPayback at $3/W, full / reduced
Portland, OR1,13118.2¢13.7 yrs / 19.8 yrs
Vancouver, WA1,10910.4¢22.3 yrs / over 25 yrs
Gresham, OR1,09118.2¢14.1 yrs / 20.4 yrs
Salem, OR1,17218.2¢13.3 yrs / 19.2 yrs
Eugene, OR1,20213.1¢17.3 yrs / 24.6 yrs

All 5 cities we cover in Oregon: solar payback in Oregon. Not your city? Look up your ZIP code.

Questions

How long does solar take to pay off in Hillsboro?

About 10.9 yrs to 22.1 yrs for a 8.2 kW system bought for cash, depending on the installed price ($2.50–$3.50 per watt) and on how Portland General Electric Co credits power you send to the grid. At $3.00 per watt it is 13.6 yrs with full net metering.

Is there still a 30% federal solar tax credit in 2026?

No, not for systems you buy. The Residential Clean Energy Credit (Section 25D) ended for expenditures after December 31, 2025. Leased systems and power-purchase agreements are owned by a company that may still claim a business credit and pass some of it on in the price; the payback figures here assume you buy the system with cash and claim no credit.

How much electricity does a solar panel system produce in Hillsboro?

Each kW of south-facing panels at a 20° tilt produces about 1,140 kWh a year here (PVGIS model, NSRDB weather data). East-facing panels produce 14% less, west-facing 13% less.

What does electricity cost in Hillsboro?

Portland General Electric Co residential customers paid 18.2¢ per kWh on average in 2024, fixed charges included (EIA-861). The Oregon average was 14.7¢.